- Tungsten Investing News - http://tungsteninvestingnews.com -
Planet Metals' Wolfram Camp Tungsten-Molybdenum Mine Updated
May 11, 2010 @ 2:20 pm In Tungsten Company News
Planet Metals [1] (ASX: PMQ) has now completed the assay program at the Wolfram Camp Tungsten Mine. The aim of the program is to improve the performance of the project's 150,000tpa plant and equipment before going on with the production.
The press release is quoted as saying:
Best results included: 2m @ 26.3% WO3 and 5.5% Mo from 2m (Hole BP-059); 1m @ 16.7% WO3 and 2.2% Mo from 27m (Hole WCD-044); 2m @ 3.4% WO3 and 0.1% Mo from 13m (Hole WCD-058); 3m @ 2.9% WO3 and 0.04% Mo from 5m (Hole BP-018).
Article printed from Tungsten Investing News: http://tungsteninvestingnews.com
URL to article: http://tungsteninvestingnews.com/391-planet-metals%e2%80%99-wolfram-camp-tungsten-molybdenum-mine-updated.html
URLs in this post:
[1] Planet Metals: http://www.planetmetals.com.au/
[2] Click here to access the entire news: http://www.proactiveinvestors.com.au/companies/news/6129/planet-metals-completes-assay-program-at-wolfram-camp-tungsten-mine-6129.html
Copyright © 2010 Tungsten Investing News. All rights reserved.